East China School District – East China Stadium

East China, MI

Designed By Foresite Design, Inc.
Turf Manufacturer AstroTurf
Infill Sand/Rubber
Product PowerBase YSR
Size 85,273 sq ft
Installation Date 2015
East China School District – East China Stadium — Brock surface system installation