Brandon School District – Brandon High School – Field 2

Ortonville, Michigan

Designed By: Foresite Design, Inc.
Built By: AstroTurf
Turf Manufacturer: AstroTurf
Infill: Sand/Rubber
Product: ShockPad Series
Region: Midwest
Size: 89,250 sq ft
Installation Date: 2023

Go to Top